Solvent Cement Welding Corzan® CPVC
Solvent cement welding is a fast, easy installation process that uses solvents and resin to chemically fuse Corzan® CPVC pipe and fittings together at the molecular level to create one continuous piece of plastic. Solvent cement is not glue: Glues rely on cohesion force to remain joined, whereas solvent welding is a chemical reaction that makes a single piece of Corzan CPVC from separate pieces.
The following information is an overview of instructions created by the Plastic Pipe and Fittings Association. Always defer to local codes governing which joining methods are acceptable in your area. There are different types of solvent cements, so always choose the correct solvent cement and primer for each specific installation, deferring to manufacturer’s installation guidelines.
For in-depth information and practical how-to advice on how solvent cement creates the strongest piping systems, access our free guide and watch this video for a step-by-step approach to preparing and solvent welding Corzan CPVC pipes and fittings.
Fitting Preparation
Once pipe has been cut to the desired length and ensuring that both pipes and fittings are at the same temperature, begin by beveling the pipe end with a chamfering tool. Next, wipe the fitting socket and pipe end with a clean, dry rag to remove dirt, burrs, filings and moisture. Moisture can slow the curing, and at this stage of assembly excessive water can reduce the joint strength. Then check the dry fit of the pipe and fitting: The pipe should enter the fitting socket easily 1/3 to 2/3 of the depth. If the pipe bottoms in the fitting with little interference, extra solvent cement should be used to prepare the joint.
Primer Application
Primer is needed to prepare the bonding area for the addition of the cement and subsequent assembly. It is important that a proper applicator be used to apply an even coat. Use primer conforming to ASTM F656. Use a dauber, swab or paintbrush approximately half the size of the pipe diameter, and do not use a rag. Apply the primer to the inside of the fitting socket and to the outside of the pipe end, then a second coating inside the fitting socket. Re-dip the applicator enough to ensure that primed surfaces are tacky.
Solvent Cement Application
For most applications, use only solvent cement conforming to ASTM F493. Contact Corzan CPVC support or the solvent cement manufacturer for recommendations for harsh chemical applications. Solvent cement must be applied when the pipe surface is tacky, but not wet, from primer. Joining surfaces must be penetrated and softened. Cement should be applied with a natural bristle brush or swab half the size of the pipe diameter. A dauber may be used to apply cement on pipe sizes below 2 inches. A heavy, even coat of cement should be applied to the outside of the pipe end, and a medium coat should be applied to the inside of the fitting socket. Pipe sizes greater than 2 inches should receive a second coat of cement on the pipe end.
Assembly
After cement application, the pipe should immediately be inserted into the fitting socket and rotated 1/8 to 1/2 turn until the fitting-stop is reached. The fitting should be properly aligned for installation at this time and the pipe must meet the bottom of the fitting socket. The assembly should then be held in place for ten to 30 seconds to ensure initial bonding and to avoid push-out. A bead of cement should be evident around the pipe and fitting juncture. If this bead is not continuous around the socket shoulder, it may indicate that insufficient cement was applied. In this case, the fitting should be discarded and the joint reassembled. Cement exceeding the bead may be wiped off with a rag.
For 6-inch or larger diameter pipe, a pipe puller (also called a come-a-long) is recommended to assemble the joint and hold it in place for the initial set time without applying excess force that may damage the pipe or fitting. This equipment should be set up prior to the start of priming so the assembly can happen quickly while primer and cement are still fluid.
Set and Cure Times
Solvent cement set times and cure times are a function of pipe size, temperature, relative humidity and tightness of fit. Drying time is faster for drier environments, smaller pipe sizes, high temperatures and tighter fits.
The assembly must be allowed to set, without any stress on the joint, per the time shown in the following tables. Following the initial set period, the assembly can be handled carefully avoiding significant stresses to the joint.
Recommended Set Times

Recommended Cure Times

Extra care should be exercised when systems are assembled in extreme temperature conditions. Additional set and cure times should be allowed when the temperature is below 40°F (4°C). When the temperature is above 100°F (38°C), the assembler should ensure that both surfaces to be joined are still wet with cement before joining them.
Design Considerations When Specifying Solvent Welding for CPVC
Certain factors should be considered when specifying solvent welding as the joining method for a Corzan CPVC piping job.
Thermal Expansion Allowance
Designs for Corzan CPVC systems should include compensation for thermal expansion if the total temperature change may exceed 30°. This is especially important for outdoor piping runs. Determine expansion using the formula ΔL = Lp x C x ΔT, with C = 3.4 x 10-5 in./in./°F or use the Corzan CPVC Thermal Expansion Calculator. To accommodate for thermal expansion, use expansion loops, offsets or changes in directions. Solvent cementing is the preferred method for expansion loops. Sit loops and offsets near the midpoint of the run, use 90° elbows and straight pipe and use no valves or strainers.
Support Spacing
Appropriate spacing will depend on the Corzan CPVC pipe size, Schedule and operating temperatures. You can find design input information for Corzan CPVC support spacing, anchoring, bracing and thrust blocking on the sample spec sheet.
Transitions to Metal
Corzan CPVC piping can transition to metal piping, but solvent cement must not be used. Schedule 90 Corzan CPVC is suitable for threading at or below 150°F (65.5°C), with a 50% pressure rating reduction. Always and only use manufacturer-recommended adapters for transitions between CPVC and metal.
ASTM Standards
Corzan CPVC specifications require the use of solvent cement that meets ASTM F493, used with a primer that meets ASTM F656. Requirements are stricter for potable water applications: both primer and solvent cement must be NSF-listed and approved for use by the pipe and fitting manufacturer. Follow ASTM F402 for safe handling, and contact Lubrizol or the solvent cement maker for harsh chemical application projects. When writing specifications, name both solvent cement standards and require manufacturer approval to avoid inappropriate substitutions, such as one-step or PVC cements.
How Solvent Welding Compares to Other Joining Methods
Solvent welding is a fast, reliable way to join Corzan CPVC piping. Other materials require other joining methods. See below for how they compare.
| Attribute | Solvent Cement (Corzan CPVC) |
Grooved Mechanical (Steel) |
Press-fit (Copper, Stainless Steel) |
Threaded (Steel) |
Socket or Butt Fusion (PP-R, PP-RCT, HDPE) |
Arc Welding (Steel, Stainless Steel) |
|---|---|---|---|---|---|---|
| Tools and Power Source | Hand tools (deburring / chamfer tool), ASTM F656 primer and ASTM F493 cement. No power source required. | Groover, couplings, gaskets & hand tools to tighten bolts. Power groover required. | Press tool (battery or corded), deburring tool, press fittings. | Pipe threader /wrenches, thread sealant or tape. Threader power. | Socket: heating iron. Butt: hydraulic fusion machine, facer, heater. Power required. | Welding machine and power source or generator, filler, grinder, fit-up tools, PPE, fume control. |
| Hot Work Permit Needed | No | No | No | Site / AHJ dependent. | Site/AHJ dependent. | Yes |
| Fire Watch Personnel Needed | No | No | No | No for the make-up itself. | Yes | Yes |
| Certified Labor | No welder certification, proper cement welding training essential. | No welder required, installation training essential. | No welder certification, licensed, trained professionals familiar with the product. | Authorized training required. | Authorized installer training required, HDPE requires qualified fusion technicians. | Yes. Welders qualified to ASME Section IX under B31.3. |
| Time per Joint | Hold 10-30 seconds. About 50% faster than welding. | 50-60% faster than welding. | 4-7 seconds per press or up to 16 seconds depending on system. | Variable | PP-R socket: heat 5-60 seconds. Butt, fusion: heat 1.5-6.5 minutes plus cooling. | Minutes for grooved vs hours for a certified weld. |
| Cure or Cool Time Before Pressure Test | Depends on pipe size, temperature & humidity. Allow extra in humid or below 40°F (4.44°C) conditions. | None | Pressure testing may be done immediately. | None | PP-R socket: 2-8 min. (1/2-4 in.). PP-R butt: 5-50 min. HDPE butt: about 11 min per inch of wall under pressure, plus + 30 min | None. Inspection required before testing per B31.3; some materials need post-weld heat treatment. |
| Joint Integrity | Very high. Corzan CPVC pipe held at 2,900 psi in burst test (testing unit’s limit). | Seal depends on pipe-end prep. | EPDM seals. Operating range & pressure capacity vary by system & size. | Depends on thread quality & sealant. Vibration & thermal cycling can cause leaks. | Fused pieces become a single bonded joint. | Strongest continuity. Sensitive to end prep, alignment, distortion. |
| How and When to Rework | If cement coverage is incomplete, disassemble & reassemble. | Union at every joint allows quick recoupling. | Connections can be made wet or dry for repairs. | Cross-threading, under- or over-doping cause leaks; early seepage after cycling. Re-make joints in these cases. | Leaking joints can be repaired with new fittings. Repair pins are not suitable for fusion leaks. | Defects require grinding or cutting, rewelding & reexamination. |
VIDEO: Solvent Welding Corzan CPVC
Watch this video for a step by step approach to preparing and solvent welding Corzan pipes and fittings.
Get Customized Training on Installing Corzan CPVC
We know every project made with Corzan CPVC is unique. Fill out the form to discuss and schedule customized training.
Submit the form and an expert will be in touch within one business day.